4Front Logo
Service Flow Login  |  Case Studies  |  News  |  Client list   |  Useful Links  |   24 Hour Service Desk   |   Vacancies   |   Contact Us
 
Energy Services environmental_services building_services_maintenence renewables
inset_image

Irish Nationwide Building Society - 2008

Location: Grand Parade

Client: Irish Nationwide

System:
Retrofit Computer room cooling from Central Chilled Water System to Liebert N+1 (2 X 30kW) Direct Expansion with Free Cooling coil achieving savings on running cost and improved uptime.

Savings:   60% Savings on Energy €33,000 pa

Payback:  1.9 years

Service:          

  1. Design
  2. Project Management
  3. Full retrofit
  4. Service and Maintenance

 

 
Forbes Quay Apartments
     

Riverside 2 Car Park Lighting - 2009

 

Location: Sir John Rogersons Quay

Client: Riverside 2 Management Company

System:
Replacing SON lighting in 150 space underground Car Park with Fluorescent using presence switching and daylight dimming.

Savings: 64% Savings on Energy €10,000 pa

Payback:  1.7 years

Service:          

  1. Design
  2. Project Management
  3. Full retrofit
  4. Service and Maintenance

 

 

 
Robbin Hill Apartments - 2008
     

Smithfield Market Underground Car Park - 2009

 

Location: Smithfield, Dublin

Client: Smithfield Management Company

System:
1-Energy Procurement contract
2-Ventilation Control Strategy

Savings: €50,000 pa

Payback: 3 months

Service:
1. Energy audit and
2. Condition report
3. Ventilation study
4. New ventilation strategy

 

 
Office Depot Warehouse - 2008
     

Irish Nationwide Building Society - 2008

 

Location: Grand Parade

Client: Irish Nationwide

System:
Retrofit installation of new Phillips lighting system including daylight dimming and presence sensing. Energy savings in excess of 40%.

Savings: 46% Savings on Energy €12,650 pa

Payback: 0 - End of life project

Service:
1. Design
2. Project Management
3. Full retrofit
4. Service and Maintenance

 

 
     

Riverside 2 HVAC Controls - 2008

Location: Sir John Rogersons Quay

Client: Riverside 2 Management Company

System:
Optimising HVAC -Heating ventilation and air conditioning system through improved control strategy to closely match business requirements. Phase 1.

Savings: 20% Savings on Energy €32,000 p. a.

Payback: No additional cost. Included in Facilities Management contract.

Service:
1. Logging system performance
2. Developing performance targets
3. Implementation and continuous monitoring

Go Back >>

 


 
     
Website designed by: Flavour 9